Service

Construction-site clearance and on-site recycling

Separation of material streams and controlled processing of suitable mineral material under the project and applicable waste-management plan.

ZVER · Alpin Jobs EOOD · Bulgaria · EIK 200328636

Cleaning, separation of material flows and processing of the suitable mineral fraction of the site under the applicable Bulgarian construction waste management plan (ПУСО), the project and the applicable requirements.

Approach

Decision after real assessment.

When there is vegetation, bulky items, mixed construction waste and concrete on the ground, the job starts with zoning and grading — not indiscriminate crushing. The appropriate mineral fraction may be crushed and fractionated at a site for a predetermined application, but compliance does not automatically arise from mechanical processing.

Submit location, approximate area, photos, access information and purpose.

  • Construction sites before the next stage of work
  • Mixed flow terrains to be identified and separated
  • Projects with suitable concrete for controlled crushing and design intended reuse
  1. Review, identification and zoning of material flows
  2. Reconciliation of the fractions, quantities and operations with the applicable Bulgarian construction waste management plan (ПУСО) and the project
  3. Controlled shredding, fractionation, traceability and verification for intended input

Details

One terrain, different material flows

Trees and stumps, wooden elements, metal, plastics, concrete, bricks, soil and mixed accumulations are not treated as one common mass. Pre-separation keeps the mineral stream clean and allows determining what can be recovered and what must leave the site in the applicable order.

Materials suspected of containing asbestos, tars, oils, hazardous coatings, or other contamination are not fed to the general flow. They are isolated pending identification and resolution by the competent participants.

Where a Construction Waste Management Plan is applicable to the site, work areas, separate collection, quantities and subsequent operations shall be consistent with it. Controlled shredding is part of the implementation of the plan, not a substitute for it.

Traceability links origin, inflow, processing, fractions obtained, quantities and final destination. The necessary tests, evaluations and declarations are determined according to the status of the material and the intended application.

A suitable and controlled mineral fraction can be considered for a backfill, a temporary technological road, a work site or another layer specified by the design. Features, placement and control must meet the requirements of the particular use.

On-site processing can reduce some of the hauling and delivery of new material, but the actual effect depends on the quantities, quality, technology, distances and project. No universal savings rate is promised.

Alpin Jobs EOOD collects, transports and handles waste only within the documented scope under the Bulgarian Waste Management Act (ЗУО). For each task, the waste code, operation, facility, site and territorial scope are checked.

Registrations, certificates, numbers and exact ranges are published only after documentary verification. This service does not extend activities beyond the documented scope.

Real footage

Field work.

The field record shows clearance, material separation and controlled processing within the verified project scope.

Related archive objects

Comprehensive cleaning of the terrain of a former military unit

Location not published

Dragalevtsi

The same line of work

Related Services.

In a complex task, these operations can be part of a general sequence, but the exact scope is determined for the specific terrain.

Site preparation prior to construction and infrastructure activities.

Vegetation clearance during the preparation and maintenance of land for energy infrastructure.

Preparation and maintenance of linear objects, technical corridors and service roads.

Next step

Let's see the field.

Submit location, approximate area, task and current photographs.

Construction site with concrete and brick piles before grading and processing
The mineral material is evaluated and sorted before a decision for crushing and reuse.

ZVER

Related services

Discuss the actual site with our team.

Send the location, approximate area, photographs, access information and required result.